EPC+M+O Full-cycle Operation Experience of Tanzania 1200t/d Gold Processing Plant
Overseas mining projects are faced with many uncertain factors such as complex construction conditions, insufficient local supporting resources and imperfect technical personnel system, which easily lead to delayed construction period, unqualified project quality and unstable later operation. The Tanzania 1200t/d gold mineral processing plant adopts Xinhai Mining’s one-stop EPC+M+O full-service mode, covering project design, equipment procurement, construction and installation, commissioning and production operation management, and successfully overcomes various construction difficulties to deliver a high-quality stable-operating processing plant.
In the pre-construction stage of the project, Xinhai Mining carried out comprehensive and detailed overall planning work. The professional project team completed geological condition investigation, ore property analysis, process scheme demonstration, construction technical scheme formulation and project management system establishment in advance. At the same time, the team made full preparations for equipment procurement, material reservation, human resource deployment and multi-party coordination, effectively avoiding various potential risks such as material shortage and technical mismatch in the later construction process, and laying a solid foundation for the smooth progress of the project.
During the on-site construction stage, affected by the backward local industrial supporting conditions in Tanzania, the project once faced multiple difficulties such as insufficient construction materials, lack of mechanical equipment, scarce professional construction tools and shortage of local technical personnel. In response to the emergency situation, Xinhai Mining quickly launched the overseas project emergency support mechanism, dispatched professional construction and technical teams from China, transported supporting construction equipment and materials to the site, and carried out professional technical training for local employees, effectively solving the problem of resource and personnel shortage and ensuring the on-time progress of the project construction.
In terms of construction quality control, most of the project’s mineral processing equipment is made of thin steel plate materials, which are light in weight and convenient for on-site assembly, but easy to deform during long-distance transportation and high-altitude hoisting, affecting equipment installation accuracy and later production stability. For this key quality risk point, Xinhai’s construction team formulated special protection plans, adopted professional shockproof packaging and fixed measures for equipment transportation, and standardized hoisting operation specifications to avoid equipment extrusion and deformation. Strict quality inspection was carried out after installation to ensure that all equipment meets the production installation standards.
The full-cycle management advantage of EPC+M+O mode is fully reflected in this project, realizing zero-risk delivery and stable long-term operation of the overseas mining project. To learn more about the full-cycle management methods, difficulty solving strategies and successful experience of overseas mining EPC+M+O projects, please browse: EPC+M+O Mining Project: Full-cycle Construction and Operation Management Solution.